Stakeholder Engagement Plan – Part 3
This week, you will continue developing your Stakeholder Engagement Plan using the following resources:
• Stakeholder Engagement Plan Template
• Article: “Lessons Learned from Managing the Design of the ‘Water Cube’ National Swimming Centre for the Beijing 2008 Olympic Games”
Use the Water Cube project article as the context for this Assignment and the Stakeholder Engagement Plan Template as your guide. Complete Section D of your Stakeholder Engagement Plan. The requirements for the content and length of each section are provided in the template. For this Assignment, address the following for the Water Cube project:
• Describe the level of power and interest each stakeholder has in the project.
• Describe each stakeholder’s potential impact on the project, based on power and interest.
• Prepare a stakeholder power/interest grid for the project.