:Using a Standard Method of Measurement (SMM) and following the traditional method of measurement, take-off quantities for the following substructure items as shown in the drawings: • QSP7PCM D0810 • QSP7PCM D0814 • QSP7PCM D0830 • QSP7PCM D0831.

Task :Using a Standard Method of Measurement (SMM) and following the traditional method of measurement, take-off quantities for the following substructure items as shown in the drawings:
• QSP7PCM D0810

• QSP7PCM D0814

• QSP7PCM D0830

• QSP7PCM D0831

List of items to be measured:

• Topsoil excavation

• Topsoil retention

• External trench excavation

• Disposal of excavated material

• Concrete in trench foundation

• Brickwork below DPC (up to DPC level)

• Damp Proof Course (DPC).

Your submission should include:

a. A taking off list

b. Marked up drawings.

c. A query and answer sheet

d. Measurement in the traditional dimension paper.
(approximately 800 words equivalent)

Ignore the measurement of telescopic vents. A bill of quantities is not required.