Task :Using a Standard Method of Measurement (SMM) and following the traditional method of measurement, take-off quantities for the following substructure items as shown in the drawings:
• QSP7PCM D0810
• QSP7PCM D0814
• QSP7PCM D0830
• QSP7PCM D0831
List of items to be measured:
• Topsoil excavation
• Topsoil retention
• External trench excavation
• Disposal of excavated material
• Concrete in trench foundation
• Brickwork below DPC (up to DPC level)
• Damp Proof Course (DPC).
Your submission should include:
a. A taking off list
b. Marked up drawings.
c. A query and answer sheet
d. Measurement in the traditional dimension paper.
(approximately 800 words equivalent)
Ignore the measurement of telescopic vents. A bill of quantities is not required.