Chat with us, powered by LiveChat

Consider the following scenario: You are the safety manager for a team that is working to complete a 10-story addition to a hospital.

Words: 351
Pages: 2
Subject: Civil Engineering

Consider the following scenario: You are the safety manager for a team that is working to complete a 10-story addition to a hospital. The framework of the addition will be steel and concrete. The floors will be formed and poured with reinforced concrete on metal decking. The outside will require brick and glass window installation and installation of a standing seam metal roof. The interior will consist of metal stud framing with drywall and tile floors. The building will be centrally cooled and heated with a heating, ventilation, and air condition (

) mechanical system, and it will need a new electrical supply source.The electrical rooms will be located in the southeast corner of each floor near the stairwell. Plumbing and fire suppression systems must be installed. There will be a bank of elevators in the main entrance/northside center and a service elevator in the back/southside center. There is suspected asbestos in the flooring and piping where the new addition connects to the existing structure. A new entrance must be constructed off the side street/northside, with a driveway, sidewalks, drainage, lighting, and landscaping installed.You must complete a site-specific safety program (SSSP) for the project. Use the SSSP template.

Course Project: Part II – 15 slides

Building off the site-specific safety program (SSSP) in Unit VII, you will develop a site-specific orientation program that you could use for new hires to the project outlined in Unit VII. Remember to include the specific details of the project and not just a general Occupational Safety and Health Administration (OSHA) compliant orientation.

Be specific, and include any details that might be relevant to the specific project that workers coming onsite might need to know. Include any specific site hazards that may be encountered, the solutions to those hazards, and any additional details you may wish to include. Your presentation must be specific to the project outlined in Unit VII and must be original.

Be sure to include your training notes in the speaker notes section of each slide. If outside sources are used, please adhere to the correct formatting style when creating citations and references for this assignment.