BIM for the built environment
A. As part of your role, you have been asked to critically evaluate the term Building Information Modelling (BIM) in the context of local, national, and global developments.
B. You should discuss the available UK standards, protocols, documentation, etc. and explain their purpose, contents, and requirements specifically to the delivery of a BIM project. Analyse the decisions necessary to be made during different stages of project lifecycle with a flow chart.
C. Analyse the drivers/enablers and challenges/barriers of using BIM for SMEs.
D. Evaluate the roles required to successfully deliver a BIM project and discuss the BIM managers role during various phases of the project lifecycle.
E. Identify the possible future developments within the BIM job role.