Tag: Fortezza
-
You have been consulted as an expert with respect to the Emergency, Risk and Safety Management practice to prepare a Risk Management Plan for this Project. This will require you to carry out the following: Risk identification, qualification and quantification.
Risk Management Plan The Brenner Base Tunnel (BBT) is a straight, flat railway tunnel connecting two countries. It runs for 55 km between Innsbruck (in Austria) and Fortezza (in Italy). This project has been defined as a masterpiece of engineering in Europe. You have been consulted as an expert with respect to the Emergency, Risk…